| This project included the installation of a temporary steel cofferdam and dewatering pump system. The dewatering system remained throughout the entire job. Additional dewatering measures were taken to keep water from seeping up through the porous limerock.
Demolition and complete removal of the existing concrete boat ramps.
Installation of three 55'x20' concrete ramps, replacement of floating docks.
This project was completed in 2007 ...Read