| Details: This project included aproximately 800 linear feet of shoreline riprap along with an additional 800 linear feet of 8" cellular confinement material as shoreline erosion stabilization, inside Sebastian Inlet State Park South.
The cellular material had to be anchored at the top by digging a 2' trench the entire 800LF. Throughout, this material was anchored using tendons and anchor hooks which were secured into the sand. It was then filled with limerock stone and seeded. |