| Details: This project included the demolition and re-construction of an existing Heavy Timber Vehicular Bridge. This bridge is the only access to the beach area located in the back of the park.
After a through investigation, the large support beams under the decking were rotting, some were replaced while others were secured with a double pressure treated paralam.
This project was conpleted in January 2009
Click on the vendor link below for paralam specifications and information.
http://www.galyonlumber.com/ |